A...archived (blue)       P..produced (green)       expected(white)      N/A (gray)

WP3 deadline
(2017)
 1
COS
(edzw) 

2
COS/En
(edzw)

3
HAR/V1
(eswi)
4
HAR/V2
(eswi)
5
MES/V1
(eswi)
6
MES/V2
(eswi)
7
M-S
(lfpw)
8
M-S/En
(lfpw)
9
UM
(egrr)
10
UM/En
(egrr)
Feb May    A 
 P 
AP  A   P   A   P
 A  PA  P   A   P   A   P
 A   P   A   P 


2016



















  2015                    
  2014                    
  2013                    
  2012                    
  2011                    
  2010            
 

    
  2009            
 
     
  2008            
 
     
  2007            
 
     
  2006            
 
     
  2005            
       
  2004                    
  2003                    
  2002                    
  2001                    
  

2000

                    
  1999                    
  1998                    
  1997                    
  1996                    
  1995                    
  1994                    
  1993                    
  1992                    
  1991                    
  

1990

                    
  1989                    
  1988                    
  1987                    
  1986                    
  1985            
       
  1984            
       
  1983            
       
  1982            
       
  1981            
       
  

1980

                    
  1979                    
  1978                    
  1977                    
  1976                    
  1975                    
  1974                    
  1973                    
  1972                    
  1971                    
  

1970

                    
  1969                    
  1968                    
  1967                    
  1966                    
  1965                    
  1964                    
  1963                    
  1962                    
  1961                    

1 Comment

  1. On behalf of Eric Bazile:

    In the attached documents (doc1, doc2) it is the list of parameters with the GRIB2 code and also the frequency output 1h or 6h or only at 6Utc for precipitation analysis.

    Each member of MESCAN-SURFEX-ENS  will contain the same amount of data as the reference 50-years product so in term of size 8 members for 5 years = 40 years of the reference product.

    Rachid has started to put on mars=test the final product for MESCAN for ana and some fc fields. in green in the attached file: final_parameter_list_mars_test.pdf. So 2005-2010 will be updated today and tomorrow and 1981-1985 for friday or no later than Monday 6th March.

    The MESCAN-SURFEX-Ens with 8 members with all the fields should be put on Mars for the end of March. Antoine and Rachid have prepared a full sample of data for 15 days (hourly output and 14 levels) for a final test on Mars-scratch  before to put on "test" or "prod"

    The rest of the parameter are SURFEX output and will be available later in Sept 2017. We will start the production MESCAN analysis and SURFEX-TRIP for the period 1961-1970 in April. If we are lucky may be we can have for 1st July this 10 year period validated on Mars-prod with all the output.