Status:Finalised Material from: Linus, Ivan, Mohamed

 

 

1. Impact

On 2 September the tropical cyclone Hermine made landfall on the north-western side of Florida.

http://www.bbc.co.uk/news/world-us-canada-37248359

https://en.wikipedia.org/wiki/Hurricane_Hermine

During its life-time the cyclone challenged the forecasting system several times. Firstly, whether or not the cyclone was going to develop east of Florida, later about the landfall on the Gulf of Mexico and finally about re-intensification over the Atlantic and a landfall on the U.S east-coast.

2. Description of the event

The sequence of plots below shows 12-hour forecasts of MSLP and precipitation (as a substitute of analyses) valid from 28 August 00z to 6 August 00, zwith 24 hours apart. Before the sequence starts a convective system was present over the Caribbean and was on 25 August located north of Hispaniola. On 28-29 August the convection reached Florida. TC Hermine was upgraded to hurricane on 1 September and made landfall on northern Florida on 2 September. The storm later moved to north-east and reached the Atlantic on 4 September.



3. Predictability

  

3.1 Data assimilation

During different stages of Hermine, extensive dropsonde missions took place by using the NASA Global Hawk platform. The different plots below show the observation statistics for dropsondes for temperatures and wind vector difference for the days with most dropsondes. The panels in each plot shows the first guess departures (obs-fg, right) and analysis departures (obs-an, left). The top row is for all dropsonde observations and the bottom for used observations. Each panels include averaged statistics in the title bar. In all but one of the plot, the standard deviation of the departures is decreased from the first guess to the analysis.

25 August 12z



30 August 00z



30 August 12z



31 August 12z



1 September 00z



1 September 12z



2 September 00z


 

3.2 HRES

The plots below shows the HRES forecasts from 25 August and 26 August 00z for the MSLP and rainfall for 30 August 00z. The figures illustrates the the change in the forecast regarding the cyclogenesis east of Florida around 29-30 August. The change in the forecast took place at 25 August 12z.


Tropical cyclone Hermine made landfall over Florida and passed over few other states on Friday, 2nd September. It brought a lot of rain, strong winds and caused flooding. Short-range HRES provided a good precipitation forecasts. The shape of the rain band was very well captured in the forecast compared to the NEXRAD.


3.3 ENS

The plots below show the tropical cyclone activity for 31 August to 1 September. Already in the earliest forecast presented here (from 24 August, bottom-right plot), the probability for a tropical cyclone in the northern part of Gulf of Mexico was above 20% and in the forecast from 25 the probability increased to above 50%. However, in the subsequent forecasts the probability decreased again. This change was connected to the whether the cyclone should form already in the Atlantic, which it did not. But later Hermine formed in the same tropical depression.

 

The intensification of Hermine that was in early forecast once it starts moving over the Atlantic did not materialize. When Hermine made landfall on Friday, 2 September, it lost a lot of its intensity and more or less it's kept it later when it moved again over the ocean whilst some early forecasts suggested intensification especially the HRES. The good point is that the reported core pressure falls within the ENS range although at the upper tale of ENS distribution. It's also worth mentioning that the ensemble spread was quite large and the HRES was also within the range of the ensemble but at the lower tail. Regarding the track, Hermine moved north-eastwards at some point it changed the direction approaching the north-east US coast. That turn in the direction was given by a number of ensemble members as well.

Verification of Hermine's track forecast based on 2 September 00UTC run. Red dots represent the reported core pressure of Hermine.


3.4 Monthly forecasts


3.5 Comparison with other centres

Two other global prediction centres, UKMO and NCEP, also provided good short-range forecasts for the rainfall after the landfall. It's worth mentioning that the resolution of HRES is high enough to capture structures in the rain field which are more realistic than lower resolution global models. In the very short-range forecast (T+12-36h) we can spot the eye of the cyclone with less rain than the surrounding area and spiral structures that were also observed although with some location errors.



4. Experience from general performance/other cases

 

5. Good and bad aspects of the forecasts for the event

  • Early capturing of the movement of the tropical depression.
  • Forecast too confident about cyclogenesis in the Atlantic before Florida, connected to the convective system?


6. Additional material